Tuesday, August 28, 2012

CB1000R Ermax installation

The Ermax's installation instruction is very poor in my opinion .

1. First of all remove original top fairing plate, by unpinning 2 plastic clips







2. The result shall be looked like this


3. Now for removing all the light plate we have to release  the following 2 screw
   before:

   after: 


4. Then you have to push up the all construction up (carefully, till the 2 pins released)

The result:




The pins ->




The hols for pins ->

5. Now you can release 3 bolts the installation manual is talking about.

You need to do it for expanding the holding form

Before adding the expansion:
















After the expansion:




6. Fitting the internal screen part, using one bolt screwed into a expansion frame



7. Fitting the screen itself on top of internal part